International forum
“Marine Industry of Russia”

Moscow, “Gostiny Dvor”
Exhibition Hall,
May 16-18, 2012


Time left till opening of the Forum:

269 days 9 hours 25 minutes

 

Electronic catalogue


The Ministry of Transport
of the Russian Federation
FGU «Rostransmodernizatsiya»

General information partners








Sudprom.ru News on Shipbuilding, Ship-Repair, Navigation and Russian Fleet Operation













Search for the participant >>>

Enter the site >>>

Forum bulletin


Free pass reservation to Marine Industry of Russia International Forum-2010

NEWS of marine Forum

February 17, 2011
The crew of tanker “NS Century” owned by Novoship is reported by the Press Service of the shipping company to have defeated the armed attack in Indian Ocean.Sovcomflot tanker defeats armed attack in Indian Ocean

December 14, 2010
New Year special offer! Gift registration fee for participation in Forum till January 15!

October 12, 2010
“It is feasible to develop high-technology relying on domestic resources!”Interview with Lev S. Lazarev, Director General of “Muromsky Radiozavod



OAO Novaya ERA Will Develop Electric Installations for Offshore Projects

May 30, 2010

OAO Novaya ERA won an open tender for carrying out research and development works in the area of development of power distributing equipment for offshore drilling platforms. The tender was organized by the Ministry of Industry and Trade of the Russian Federation.

OAO Novaya ERA is one of few Russian enterprises producing offshore switchboard equipment. The winning of this tender for 2.5 year research and development works again confirms high qualification of staff, high level, competitive ability and reliability of equipment produced by the enterprise.

The works to be done comprise development of design and production documentation of a series of standard power distributing equipment with module boxes as well as production and testing of prototype models of equipment under development.

One of the main development tasks is extensive application of home-made components and gradual complete rejection from imported ones. Temporary use of foreign-made components is admitted only if necessary home made components lack and only for the period of their design and production exclusively by agreement with the Customer.

In the course of research and development works, specialists of OAO Novaya ERA intend to develop four new technologies:

  • technology of formation and construction of the module box structure for a standard power distributing device;
  • technology of formation and application of medium-voltage equipment with operating voltage ranging from 6 to 10 kV both with insulated or grounded neutral;
  • technology of functional-structural configuration of relay-protective equipment incorporated into a box, such equipment ensuring all kinds of electric protection to equipment, bus lines and cables;
  • technology of discrete and digital communication of relay-protective equipment with CMS and connected electrical loads’ equipment.

Source: Setcorp.ru

Read also:

 
 

© Marine Industry of Russia, 2009-2010. All rights reserved.

By: “Ideological buiseness-projects”

Design by Valentina Ivanova.