As part of the ”Day of the Arctic” at the ”round table” - ”Creating a new image of modern high-tech shipbuilding industry. Ships and offshore structures for hydrocarbon exploration and production on the Arctic shelf, ” is scheduled the performances: : NEWS of marine Forum : Marine Industry of Russia
V International forum
“Marine Industry of Russia”
Moscow, “Gostiny Dvor”
Exhibition Hall,
19-21 May 2015

Time left till opening of the Forum:

45 days 0 hours 51 minute

 

Forum bulletin


The Ministry of Transport of the Russian Federation FGU «Rostransmodernizatsiya»

Media partners

Interfax

Neftegaz.tv

As part of the ”Day of the Arctic” at the ”round table” - ”Creating a new image of modern high-tech shipbuilding industry. Ships and offshore structures for hydrocarbon exploration and production on the Arctic shelf, ” is scheduled the performances:

April 04, 2012

1) Federal State Unitary Enterprise “Central Scientific Research Institute im. Acad. AK Krylov “
1.1), innovative solutions – the basis for the development of advanced means of the Arctic shelf.
1.2) The complex conceptual design of marine equipment for the Arctic shelf (marine ice-resistant technology platform, jack-up for the ultimate shallow water drilling on an air cushion).
1.3) for compressed gas Lawns – new opportunities and prospects.
1.4), the Court provide for the deposits on the Arctic shelf (drill, pipe layer, a floating crane).
Two. CDB ME “Rubin” – a report on the helicopter platform.
Three. SPKB – Report on the Arctic shuttle – gas.
4. CMDB “Diamond” – a report on the Arctic shallow-draft tanker.
(Appendix – Minutes)

Read also:

 
 

© Marine Industry of Russia, 2009-2010. All rights reserved.

By: “Ideological buiseness-projects”

Design by Valentina Ivanova.